CECS 227-2007
Technical specification for application of plastic inspection chambers for sewerage in building area (English Version)

Standard No.
CECS 227-2007
Language
Chinese, Available in English version
Release Date
2007
Published By
Professional Standard - Recommended Standards for Engineering Construction
Latest
CECS 227-2007
Scope
This procedure is applicable to the design, construction, and construction of plastic drainage inspection well projects within construction communities (residential areas, public building areas, factories, etc.) where the outer diameter of buried plastic drainage pipes is not greater than 800mm, the burial depth is not greater than 6m, and the operation does not go down the well. Inspection and maintenance. This procedure does not apply to the connection of concrete or reinforced concrete pipes in construction areas.

CECS 227-2007 history

  • 2007 CECS 227-2007 Technical specification for application of plastic inspection chambers for sewerage in building area
Technical specification for application of plastic inspection chambers for sewerage in building area



Copyright ©2024 All Rights Reserved