SY 4201.1-2007 Code for quality accptance of oil and gas construction engineering Equipment installation engineering Part 1: Mechanism and pump device (English Version)
This part of SY 4201 stipulates the inspection batch and sub-project construction site quality management and quality control regulations for equipment installation projects and pump equipment installation projects. This section applies to the acceptance of the construction quality of pump equipment in equipment installation projects for oil and gas construction projects, including centrifugal pumps (including oil transfer pump units, water injection pumps below 45MPa), axial flow pumps, well pumps, screw pumps, and reciprocating columns. The overall installation of plug pumps; the overall installation of piston gas compressors, centrifugal fans, centrifugal blowers, axial flow fans, centrifugal compressors; the installation of beam pumping units; with duct type combustion chambers and horizontal joint surface structures Installation of gas turbine power plants.
SY 4201.1-2007 Referenced Document
GB 50204 Specification for construction quality acceptance of concrete structure engineering*, 2015-09-01 Update
GB 50231 General code for construction and acceptance of mechanical equipment installation engineering *, 2009-03-19 Update
GB 50235 Code for construction of industrial metallic piping engineering*, 2010-08-18 Update
GB 50275 Code for construction and acceptance of fan,compressor and pump installation*, 2010-07-15 Update
JB/T 9591.1 Gas turbine.Oil system cleanliness*, 2015-10-10 Update
SY 4200-2007 Code for quality acceptance of oil and gas construction engineering.General rule
SY 4201.1-2007 history
2019SY/T 4201.1-2019 Specifications for Construction Quality Acceptance of Oil and Gas Construction Projects Equipment Installation Project Part 1: Machines and Pumps
2016SY 4201.1-2016 Code for quality acceptance of oil and gas construction engineering.Equipment installation engineering.Part 1: Mechanism and pump
2007SY 4201.1-2007 Code for quality accptance of oil and gas construction engineering Equipment installation engineering Part 1: Mechanism and pump device