This part of IEC 62264 defines activity models of manufacturing operations management that
enable enterprise system to control system integration. The activities defined in this standard
are consistent with the object models definitions given in IEC 62264-1. The modelled activities
operate between business planning and logistics functions, defined as the Level 4 functions
and the process control functions, defined as the Level 2 functions of IEC 62264-1. The
scope of this standard is limited to
– a model of the activities associated with manufacturing operations management, Level 3
functions;
– an identification of some of the data exchanged between Level 3 activities.
IEC 62264-3:2007 Referenced Document
IEC 62264-1:2003 Enterprise-control system integration - Part 1: Models and terminology
IEC 62264-2:2005 Enterprise-control system integration - Part 2: Object model attributes
ISO 15704:2000 Industrial automation systems - Requirements for enterprise-reference architectures and methodologies
IEC 62264-3:2007 history
2016IEC 62264-3:2016 Enterprise-control system integration - Part 3: Activity models of manufacturing operations management
2007IEC 62264-3:2007 Enterprise-control system integration - Part 3: Activity models of manufacturing operations management