This standard stipulates the principles, projects, procedures, depth and methods of hydropower engineering immigration professional project planning and design. This standard is applicable to professional resettlement project planning and design for construction land acquisition and resettlement in the pre-feasibility study report stage, feasibility study report stage, and resettlement implementation stage of large and medium-sized hydropower projects (including pumped storage power stations).
DL/T 5379-2007 Referenced Document
DL/T 5092 Technical regulations for the design of 110-500KV overhead power transmission lines
GB 50013 Outdoor Water Supply Design Standards*, 2019-08-28 Update
GB 50059 Code for design of 35kV~110kV substation*, 2011-09-16 Update
GB 50061 Code for design of overhead power lines of 66KV and below*, 2010-01-18 Update
GB 50071 Code for Design of Small Hydropower Stations*, 2024-04-18 Update
GB 50187 Code for design of general layout of industrial enerprises*, 2012-03-30 Update
GB 50192 Code for design of river port engineering
GB 50201 Standard for flood control*, 2014-06-23 Update
GB 50288 Irrigation and Drainage Engineering Design Standards*, 2019-04-03 Update
GB 5749 Hygienic Standards for Drinking Water*, 2022-03-15 Update
GBJ 22 Code for design of roads in factories and mining areas (explanation)
JTG B01 Technical Standard of Highway Engineering*, 2014-09-30 Update
SL 252 Classification of water conservancy and hydropower projects and flood standards*, 2017-01-09 Update
SL 310 Technical specifications for village and town water supply projects*, 2019-09-30 Update
DL/T 5379-2007 history
2021NB/T 10801-2021 Specifications for planning and design of professional land acquisition and resettlement projects for hydropower engineering construction
2007DL/T 5379-2007 Specification of planning and designing for resettlement special item for hydroelectric project
DL/T 5379-2007 Specification of planning and designing for resettlement special item for hydroelectric project was changed to NB/T 10801-2021 Specifications for planning and design of professional land acquisition and resettlement projects for hydropower engineering construction.