Scope
This International Standard defines procedures and specifications for the Factory Acceptance Test (FAT), the Site Acceptance Test (SAT), and the Site Integration Test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification. Engineering and manufacturing activities prior to these tests are not covered by this standard. The description of activities described in this standard can be taken as a guideline and adapted to the specific requirements of the process/plant/equipment. A typical sequence of activities and events is shown in Figure 1, their relationship in Figures 2 and 3. Figure1-Diagram depicting typical sequence of events for FAT, SAT and SIT with respect to the project milestones Figure 2 – Diagram depicting the relationship for the SAT and SIT between the DCS and subsystems Figure 3 – Diagram depicting the relationship between the FAT, SAT and SIT with the relevant plant levels

BS EN 62381:2007 history

  • 2012 BS EN 62381:2012 Automation systems in the process industry. Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT)
  • 2007 BS EN 62381:2007 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)



Copyright ©2024 All Rights Reserved