National Metrological Verification Regulations of the People's Republic of China
Latest
JJG 1021-2007
Scope
This procedure is applicable to the initial verification, subsequent verification and in-use inspection of current and voltage transformers and combined transformers (referred to as power transformers) installed in power systems of 6kV and above. Power transformers used in power systems below 6kV, if they are not moved from the on-site installation location, should also be calibrated in accordance with this procedure.