This standard specifies the content, methods and technical requirements to be met for acceptance testing of monitoring and protection systems for steam turbines (including feed water pump turbines) in thermal power plants. This standard is applicable to acceptance testing at all stages of new construction projects for monitoring and protection systems of steam turbines (including feed water pump turbines) in thermal power plants with unit capacities of 125MW to 600MW and acceptance testing of technical transformation projects. The acceptance test of other capacity units and the test after unit maintenance can also be carried out with reference to this.
DL/T 1012-2006 Referenced Document
DL 5000 Technical code for designing fossil fuel power plants(explanation)
DL/T 5190.5 The specification of erection and acceptance of electric power constrution Part 5:Section of instrumentation and control(explanation)
DL/T 701 Terminology of Thermal Automation in Thermal Power Plants*, 2022-05-13 Update
DL/T 1012-2006 history
2016DL/T 656-2016 Acceptance test procedure for steam turbine control and protection system in thermal power plant
2006DL/T 1012-2006 Code for acceptance test of TSI & ETS in fossil fuel power plant
DL/T 1012-2006 Code for acceptance test of TSI & ETS in fossil fuel power plant was changed to DL/T 656-2016 Acceptance test procedure for steam turbine control and protection system in thermal power plant.