DL/T 656-2006
Code for acceptance test of turbine control system in fossil fuel power plant (English Version)

Standard No.
DL/T 656-2006
Language
Chinese, Available in English version
Release Date
2006
Published By
Professional Standard - Electricity
Status
 2016-07
Replace By
DL/T 656-2016
Latest
DL/T 656-2016
Replace
DL/T 656-1998
Scope
This standard specifies the content, methods and technical requirements that should be met for acceptance testing of steam turbine electro-hydraulic control systems in thermal power plants. This standard is applicable to the acceptance test of steam turbine electro-hydraulic control systems at all stages of new construction projects or technical renovation projects of thermal power plants with single unit capacity of 125MW to 600MW. The acceptance test of other capacity units and the acceptance test after major overhaul of the unit can also be performed with reference; the acceptance test of the steam-driven feed water pump steam turbine electro-hydraulic control system can be performed with reference to the relevant parts of this regulation.

DL/T 656-2006 Referenced Document

  • DL/T 657 Code for acceptance test of modulating control system in fossil fuel power plant*2015-07-01 Update
  • DL/T 659 Acceptance test procedure for decentralized control system in thermal power plant*2016-02-05 Update
  • DL/T 701 Terminology of Thermal Automation in Thermal Power Plants*2022-05-13 Update
  • DL/T 711 Test Guidelines for Steam Turbine Regulation and Security Systems

DL/T 656-2006 history

  • 2016 DL/T 656-2016 Acceptance test procedure for steam turbine control and protection system in thermal power plant
  • 2006 DL/T 656-2006 Code for acceptance test of turbine control system in fossil fuel power plant
  • 1998 DL/T 656-1998 Code for on-line acceptance test of turbine control system in fossil fuel power plant
Code for acceptance test of turbine control system in fossil fuel power plant



Copyright ©2024 All Rights Reserved