This part of GB/T 7178 gives the basic requirements and technical requirements for railway shunting operations, the regulations on the display of shunting signals, the regulations on the use of wireless shunting light display equipment, the regulations on the display of hand signals, and the regulations on the audible signals of shunting And the shunting instruction table of the railway plane wireless shunting system. This part applies to the shunting operations of national railways, joint venture railways, local railways and special railways.
GB/T 7178.1-2006 history
2006GB/T 7178.1-2006 The operating for railway shunting. Part 1: Basic regulations
1996GB/T 7178.1-1996 The operating standard for railway shunting. Railway shunting basic regulations for the operating standard