DL/T 5113.11-2005
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11: Bulb turbine and generator units installation engineering (English Version)

Standard No.
DL/T 5113.11-2005
Language
Chinese, Available in English version
Release Date
2005
Published By
Professional Standard - Electricity
Latest
DL/T 5113.11-2005
Replace
SDJ 249.3-1988
Scope
This standard specifies the installation quality grade assessment method for bulb tubular turbine generator units and ancillary equipment units in hydropower and water conservancy capital construction projects. This standard is applicable to the engineering quality grade assessment of bulb tubular turbine generator units with a single unit capacity of 2MW and above and a runner diameter of 25m and above. Other types of tubular water turbine generator sets, as well as bulb tubular water turbine generator sets with a single unit capacity of less than 2MW and a runner diameter of less than 25m, can refer to this implementation.

DL/T 5113.11-2005 Referenced Document

  • DL/T 827-2002 Start-up test code for bulb turbine and generator units
  • GB 11120 Lubricating oils for turbines*2011-12-05 Update
  • GB 50150 Electric equipment installation engineering-standard for hand-over test of electric equipment*2016-04-15 Update
  • GB/T 8564-2003 Specification installation of hydraulic turbine generator units
  • JB/T 8439 Corona-proof specification of high voltage rotating a.c machines used in high altitude area*2008-06-16 Update

DL/T 5113.11-2005 history

  • 2005 DL/T 5113.11-2005 Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11: Bulb turbine and generator units installation engineering

DL/T 5113.11-2005 Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11: Bulb turbine and generator units installation engineering has been changed from SDJ 249.3-1988 Quality degree evaluation standard for unit engineering of water resources and hydropower capital construction engineering (Part III) Installation engineering of hydroelectric generating sets.

Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11: Bulb turbine and generator units installation engineering



Copyright ©2024 All Rights Reserved