CECS 190-2005
Specification for structural design of buried glass fiber reinforced plastic mortar pipeline of water supply and sewerage engineering (English Version)

Standard No.
CECS 190-2005
Language
Chinese, Available in English version
Release Date
2005
Published By
Professional Standard - Recommended Standards for Engineering Construction
Latest
CECS 190-2005
Scope
This procedure is applicable to the design of buried glass fiber reinforced plastic sand-filled pipe pipe structures using artificial earth arc foundations in general water supply and drainage projects for urban public facilities and industrial enterprises, where the temperature of the transmission medium is lower than 40°C. This regulation is not applicable to the structural design of water supply and drainage engineering pipelines in industrial enterprises that have special requirements. The design of buried glass fiber reinforced plastic pipe structures in water supply and drainage projects can be implemented with reference to this procedure.

CECS 190-2005 history

  • 2005 CECS 190-2005 Specification for structural design of buried glass fiber reinforced plastic mortar pipeline of water supply and sewerage engineering
Specification for structural design of buried glass fiber reinforced plastic mortar pipeline of water supply and sewerage engineering



Copyright ©2024 All Rights Reserved