This guiding technical document specifies the technical requirements for wind farms to be connected to the power system. This guiding technical document is applicable to new or expanded wind farms connected to the transmission grid through transmission lines with a voltage level of 66KV and above. For wind farms connected to the distribution network through distribution lines, this guiding technical document can also be referred to.
GB/Z 19963-2005 history
2021GB/T 19963.1-2021 Technical specification for connecting wind farm to power system—Part 1: On shore wind power
2011GB/T 19963-2011 Technical rule for connecting wind farm to power system
2005GB/Z 19963-2005 Technical rule for connecting wind farm to power network
GB/Z 19963-2005 Technical rule for connecting wind farm to power network was changed to GB/T 19963-2011 Technical rule for connecting wind farm to power system .