BS EN 45510-4-6:1999
Guide for the procurement of power station equipment - Boiler auxiliaries - Flue gas desulfurization (De-SOx) plant - Flue gas desulphurization (De-SOx) plant

Standard No.
BS EN 45510-4-6:1999
Release Date
1999
Published By
British Standards Institution (BSI)
Latest
BS EN 45510-4-6:1999
Replace
95/700075 DC-1995
Scope
This standard gives guidance on writing the technical specification for the procurement of processes and equipment for the removal of sulfur oxides from the flue gas of steam generating plant for use in electricity generating stations (power stations). This guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this guide. This guide covers: —wet, semi-dry and dry systems; —systems to meet specific flue gas discharge requirements, for example sulfur content, dust content and temperature; —systems with and without marketable by-products; —systems to meet specified waste product discharge limits; —systems to meet limited choice of absorbent type and limitation of water consumption. The equipment covered by this guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied. This guide indicates to potential purchasers how their specification should be prepared so that: —the equipment type and capacity interfaces correctly with other elements of the systems particularly the boiler plant; —predicted performance is achieved; —ancillary equipment is properly sized; —reliability, availability and safety requirements are achieved; —proper consideration is given to the evaluation process and the quality measures to be applied. This guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is normally decided on the basis of the purchaser's project strategy. It does not cover: —any commercial, contractual or legal issues which are normally in separate parts of an enquiry; —any allocation of responsibilities which are determined by the contract. This guide does not prescribe the arrangement of the documents in the enquiry. NOTE As a comprehensive European environmental policy is still under preparation, this guide does not address the environmental implications of the equipment.

BS EN 45510-4-6:1999 history

  • 1999 BS EN 45510-4-6:1999 Guide for the procurement of power station equipment - Boiler auxiliaries - Flue gas desulfurization (De-SOx) plant - Flue gas desulphurization (De-SOx) plant
Guide for the procurement of power station equipment - Boiler auxiliaries - Flue gas desulfurization (De-SOx) plant - Flue gas desulphurization (De-SOx) plant



Copyright ©2024 All Rights Reserved