This specification applies to the installation of mechanical presses, hydraulic presses, automatic wire forming machines, forging hammers, forging machines, shearing machines, bending correction machines and their attachments (ancillary equipment). The installation process of forging equipment should start from the unpacking of the equipment, through assembly, leveling, and inspection of the relevant geometric accuracy, until the no-load test run is qualified and the project is accepted.
GB 50272-1998 history
2009GB 50272-2009 Code for construction and acceptance of forging-press equipment installation engineering
1998GB 50272-1998 Code for construction and acceptance of forging-press equipment installation engineering