Sets forth criteria intended to provide guidance to the designer for determining the time response requirements that are acceptable for relying on operator actions to mitigate the consequences of design basis events in nuclear power plants. Single copy price: $40.00 Order from: Shawn Coyne-Nalbach, ANS Send comments (with copy to BSR) to: Same
ANSI/ANS 58.8-1994 history
1970ANSI/ANS 58.8-2019 Time Response Criteria for Manual Actions at Nuclear Power Plants
1994ANSI/ANS 58.8-1994 Nuclear Power Plants – Time Response Design Criteria for Safety Related Operator Actions