IEC 61557-7:1997
Electrical safety in low voltage distribution systems up to 1000 V a.c. and 1500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence

Standard No.
IEC 61557-7:1997
Release Date
1997
Published By
International Electrotechnical Commission (IEC)
Status
 2007-01
Replace By
IEC 61557-7:2007
Latest
IEC 61557-7:2019/AMD1:2023 CSV
Scope
Deals with measuring equipment applied to test the phase sequence in three-phase distribution systems. Indication of the phase sequence may be mechanical, visual and/or audible.

IEC 61557-7:1997 history

  • 0000 IEC 61557-7:2019/AMD1:2023 CSV
  • 1970 IEC 61557-7:2023 Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence
  • 0000 IEC 61557-7:2019 RLV
  • 2007 IEC 61557-7:2007 Electrical safety in low voltage distribution systems up to 1000 V a.c. and 1500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence
  • 1997 IEC 61557-7:1997 Electrical safety in low voltage distribution systems up to 1000 V a.c. and 1500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence



Copyright ©2024 All Rights Reserved