AS 7519.3:2008
Railway Rolling Stock — Bogie Structural Requirements, Part 3: Passenger Rolling Stock

Standard No.
AS 7519.3:2008
Release Date
2008
Published By
Standard Association of Australia (SAA)
Latest
AS 7519.3:2008
Scope
This Standard is part of the AS 7519 suite of Standards and covers the following aspects of bogie structural requirements: - Interfaces, - Design load cases, - Analysis,- Testing, - In-service loading, - Maintenance, - In-service defects, - Actions following derailments and collisions, - Rail wheel guidance equipment on road-rail vehicles.

AS 7519.3:2008 history

  • 2008 AS 7519.3:2008 Railway Rolling Stock — Bogie Structural Requirements, Part 3: Passenger Rolling Stock



Copyright ©2024 All Rights Reserved