T/SHJX 004-2018
Shanghai Bus and Trolley Bus Dedicated Lane Intelligent System Construction Technical Guidelines (English Version)

Standard No.
T/SHJX 004-2018
Language
Chinese, Available in English version
Release Date
2018
Published By
Group Standards of the People's Republic of China
Status
 2019-08
Replace By
T/SHJX 004-2019
Latest
T/SHJX 004-2020
Scope
Relevant technical requirements for the construction of intelligent systems for dedicated bus (tram) lanes in Shanghai specifically include: 1. Work content requirements, including specific work requirements for the investigation stage, design stage, implementation stage and evaluation stage. 2. Signal priority framework, working principle and applicable conditions. 3. Signal priority control method, including strategic-level control, tactical-level control priority control strategies, and specific selection of intersection priority control strategies. 4. Requirements for the setting of signal lights, requirements for signal machines and detection methods for priority vehicles. 5. Requirements for roadside RSU and vehicle-mounted OBE under vehicle-road coordination. 6. Requirements for other auxiliary facilities.

T/SHJX 004-2018 history

  • 2020 T/SHJX 004-2020 Construction Quality Acceptance Standards for Shanghai Railway Tunnels and Underground Engineering (Trial)
  • 2019 T/SHJX 004-2019 Vehicle Infrastructure Cooperative Systems Integrated Technical Requirements of Vehicle Information System
  • 2018 T/SHJX 004-2018 Shanghai Bus and Trolley Bus Dedicated Lane Intelligent System Construction Technical Guidelines



Copyright ©2024 All Rights Reserved