T/CECPA 001-2021
Seismic Capacity Walkdown Criteria for Nuclear Power Plant (English Version)

Standard No.
T/CECPA 001-2021
Language
Chinese, Available in English version
Release Date
2021
Published By
Group Standards of the People's Republic of China
Status
 2022-06
Replace By
T/CECPA 001-2022
Latest
T/CECPA 001-2022
Scope
Nuclear power seismic capability visit is one of the most important components of the seismic margin assessment (SMA) and seismic probabilistic safety assessment (SPSA) work of nuclear power plants and the existing nuclear implementation safety assessment. In order to standardize the seismic capacity inspection of structures, systems and components in nuclear power plant seismic margin assessment (SMA) and seismic probabilistic safety assessment (SPSA), this standard fully draws on the inspection method given in the US General Implementation Procedure (GIP) As well as the method for assessing the seismic margin of nuclear power plants issued by the US Electric Power Research Institute (EPRI), this standard was formulated based on the practical experience of visiting multiple domestic nuclear power plants.

T/CECPA 001-2021 history

  • 2022 T/CECPA 001-2022 Standard review of civil nuclear safety machinery and equipment license application nuclear safety-related fan
  • 2021 T/CECPA 001-2021 Seismic Capacity Walkdown Criteria for Nuclear Power Plant
  • 2020 T/CECPA 001-2020 Technical Requirement for Configuration Risk Management at Nuclear Power Plants
Seismic Capacity Walkdown Criteria for Nuclear Power Plant



Copyright ©2024 All Rights Reserved