SAE AS4115A-2017
TEST PLAN FOR THE DIGITAL TIME DIVISION COMMAND/RESPONSE MULTIPLEX DATA BUS SYSTEM

Standard No.
SAE AS4115A-2017
Release Date
2017
Published By
SAE - SAE International
Latest
SAE AS4115A-2017
Scope
This test plan consists of two major sections for testing of MIL-STD-1553B data bus systems: Bus Network and System Integration Tests. General: This test plan defines the test requirements for: a. Verifying that the bus network@ (that is@ cabling@ couplers@ connectors and terminators) when in the final system design configuration@ complies with the requirements of MIL-STD-1553B. b. Ensuring that when the bus system (that is@ bus network@ remote terminals and bus controllers) is integrated@ it meets the specific requirements of MIL-STD-1553B@ and provides for reliable communications within its system environment. Application: This is a general test plan for any data bus system designed to meet the requirements of MIL-STD-1553B. These requirements shall apply to the bus system when invoked in a specification or statement of work. The requirements of this test plan may be used in both design verification and production tests. Tests specified herein may be performed in any order unless otherwise noted. For example@ to minimize movement of test equipment@ system tests may be combined with one another or combined with other tests of the system in which the data bus is used. When this test plan is used for design verification@ all remote terminal and bus controller designs should have been validated as per the ??Validation Test Plan for the Digital Internal Time Division Command/ Response Multiplex Data Bus Remote Terminals?? and ??Validation Test Plan for the Digital Internal Time Division Command/Response Multiplex Data Bus Bus Controllers.?? When this test plan is used for production testing@ all remote terminal and bus controller equipment should have been tested as per the ??Production Test Plan for Digital Internal Time Division Command/Response Multiplex Data Bus Remote Terminals?? and ??Production Test Plan for the Digital Internal Time Division Command/Response Multiplex Data Bus Bus Controllers.?? Special requirements such as those needed to meet armament bus requirements when specified in the individual system specification may@ when within 1553B requirements@ replace values or tolerances specified in this test plan for the purpose of generating a system test procedure.

SAE AS4115A-2017 history

  • 2017 SAE AS4115A-2017 TEST PLAN FOR THE DIGITAL TIME DIVISION COMMAND/RESPONSE MULTIPLEX DATA BUS SYSTEM
  • 2011 SAE AS4115-2011 TEST PLAN FOR THE DIGITAL TIME DIVISION COMMAND/RESPONSE MULTIPLEX DATA BUS SYSTEM
  • 1989 SAE AS4115-1989 Test Plan for the Digital Time Division Command/Response Multiplex Data Bus System
TEST PLAN FOR THE DIGITAL TIME DIVISION COMMAND/RESPONSE MULTIPLEX DATA BUS SYSTEM