EN 62381:2012
Automation systems in the process industry - Factory acceptance test (FAT)@ site acceptance test (SAT) and site integration test (SIT)

Standard No.
EN 62381:2012
Release Date
2012
Published By
CENELEC - European Committee for Electrotechnical Standardization
Latest
EN 62381:2012
Scope
This International Standard defines procedures and specifications for the Factory Acceptance Test (FAT)@ the Site Acceptance Test (SAT)@ and the Site Integration Test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification. Engineering and manufacturing activities prior to these tests are not covered by this standard. For application in the pharmaceutical or other highly specialized industries@ additional guidelines (for example@ Good Automated Manufacturing Practice (GAMP))@ definitions and stipulations should apply in accordance with existing standards@ for example@ for GMP Compliance 21 CFR (FDA) and the Standard Operating Procedure of the European Medicines Agency (SOP/INSP/2003). The description of activities given in this standard can be taken as a guideline and adapted to the specific requirements of the process@ plant or equipment. A typical sequence of activities and events is shown in Figure 1@ and their relationship are shown in Figures 2 and Figure 3.

EN 62381:2012 history

  • 2012 EN 62381:2012 Automation systems in the process industry - Factory acceptance test (FAT)@ site acceptance test (SAT) and site integration test (SIT)
  • 2007 EN 62381:2007 Automation systems in the process industry - Factory acceptance test (FAT)@ site acceptance test (SAT) and site integration test (SIT)