Preface 1 Scope 2 Normative references 3 Terms and definitions 4 Abbreviations 5 Basic requirements 6 Project layout 6.1 Construction conditions 6.2 Construction type 7 Project design 7.1 General requirements 7.2 Design standards 7.3 Water quantity guarantee analysis 7.4 Basic design parameters 7.5 Pipe network layout 7.6 Hydraulic Calculation 8 Facilities and equipment 8.1 Water source engineering 8.2 Pumping stations and first hub engineering 8.3 Water pumps and power devices 8.4 Filters and fertilizer spreaders 8.5 Pipes and fittings 8.6 Irrigators, sprinklers, water supply devices 8.7 Water measuring equipment 8.8 Automatic control system 9 Engineering construction and equipment Installation 9.1 General requirements 9.2 Construction of water source and first hub project 9.3 Installation of first hub equipment 9.4 Pipe network construction 9.5 Pipe installation 9.6 Installation of valves and pipe fittings 9.7 Installation of emitters, sprinklers and water supply devices 9.8 Installation of water measuring equipment 9.9 Pipe flushing, hydraulic test and System Trial Operation 10 Project Acceptance Appendix A (Normative) Materials should be provided for project acceptance
T/ZS 0501-2023 history
2023T/ZS 0501-2023 Specificaton for Construction of Efficiency water-saving Irrigation Projects