SAE AS4114A-2017
Production Test Plan for the Time Division Command/Response Multiplex Data Bus Bus Controllers

Standard No.
SAE AS4114A-2017
Release Date
2017
Published By
SAE - SAE International
Latest
SAE AS4114A-2017
Scope
"This test plan consists of two major sections for the production testing of bus controllers: Electrical tests and Protocol tests. General: This production test plan defines the test requirements for determining that bus controllers meet the requirements of MIL-STD-1553B@ ""Digital Time Division Command/Response Multiplex Data Bus."" Application: This is a general test plan for any bus controller designed to meet the requirements of MILSTD- 1553B. These requirements shall apply to the bus controller under test@ when invoked in a specification or statement of work. The primary intent of this test plan is to test those requirements of MIL-STD-1553 for bus controllers that have been implemented in hardware@ software@ or firmware. However@ it is recognized that some additional software may be required to meet this intent and that this software may be the operational software (or some portion thereof)@ special test software@ or some combination of these. Tests specified may be performed in any order@ combined with one another@ or combined with other tests of the subsystem in which the bus controller may be embedded. The bus controller which is under test must also have had its design validated per the ""Validation Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Bus Controllers."" This document deals only with bus controller functions which are explicitly described in MIL-STD-1553B. This document does not specify tests that check the integrity of data from the subsystem to the bus@ nor does it attempt to address the system test requirements. Special requirements such as those needed to meet armament bus requirements when specified in the individual equipment specification may@ when within 1553B requirements@ replace values or tolerances specified in this test plan for the purpose of generating a UUT production test procedure."

SAE AS4114A-2017 history

  • 2017 SAE AS4114A-2017 Production Test Plan for the Time Division Command/Response Multiplex Data Bus Bus Controllers
  • 2011 SAE AS4114-2011 PRODUCTION TEST PLAN FOR THE TIME DIVISION COMMAND/RESPONSE MULTIPLEX DATA BUS BUS CONTROLLERS
  • 1989 SAE AS4114-1989 Production Test Plan for the Time Division Command/Response Multiplex Data Bus Bus Controllers
Production Test Plan for the Time Division Command/Response Multiplex Data Bus Bus Controllers



Copyright ©2024 All Rights Reserved