BS 1139-6:2022
Metal scaffolding - Prefabricated tower scaffolds outside the scope of BS EN 1004-1, but utilizing components from such systems. Specification

Standard No.
BS 1139-6:2022
Release Date
2022
Published By
British Standards Institution (BSI)
Latest
BS 1139-6:2022
Scope
1   Scope This part of BS 1139 specifies requirements for the structural design of prefabricated tower scaffolds utilizing components from mobile access and working towers specified in BS EN 1004‑1 but in configurations that are outside of the scope of that standard. These configurations include: a) high level tower scaffolds outside the maximum height limits of BS EN 1004‑1; b) tower scaffolds with more than one working platform at one time; c) large deck tower scaffolds ; d) linked tower scaffolds ; e) cantilever tower scaffolds ; f) stepped tower scaffolds ; g) tower scaffolds used as a means of access to another place; h) non-mobile towers built on base plates instead of castors; and ...

BS 1139-6:2022 history

  • 2022 BS 1139-6:2022 Metal scaffolding - Prefabricated tower scaffolds outside the scope of BS EN 1004-1, but utilizing components from such systems. Specification
  • 2014 BS 1139-6:2014 Metal scaffolding. Prefabricated tower scaffolds outside the scope of BS EN 1004, but utilizing components from such systems. Specification
  • 2005 BS 1139-6:2005 Metal scaffolding - Specification for prefabricated tower scaffolds outside the scope of BS EN 1004, but utilizing components from such systems
Metal scaffolding - Prefabricated tower scaffolds outside the scope of BS EN 1004-1, but utilizing components from such systems. Specification



Copyright ©2024 All Rights Reserved