SAE AS4112A-2017
Production Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Remote Terminals

Standard No.
SAE AS4112A-2017
Release Date
2017
Published By
SAE - SAE International
Latest
SAE AS4112A-2017
Scope
"This test plan is broken into two major sections for the production testing of remote terminals: Electrical and Protocol. General: This production test plan defines the test requirements for verifying that Remote Terminals meet the requirements of MIL-STD-1553B@ ""Digital Time Division Command/Response Multiplex Data Bus."" Application: This is a general test plan for any remote terminal designed to meet the requirements of MIL-STD-1553B. These requirements shall apply to the remote terminal under test@ when invoked in a specification or statement of work. Tests specified may be performed in any order@ combined with one another or combined with other tests of the subsystem in which the Remote Terminal may be embedded. The Remote Terminal which is under test must also have its design validated per the ""Validation Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Remote Terminals."" The tests specified are to be used in production test of a remote terminal chip@ module or function within an equipment. It is intended that all stimuli and measurements be made via external connections and/or test points. No required access to any other points is intended. Special requirements such as those needed to meet armament bus requirements when specified in the individual equipment specification may@ when within 1553B requirements@ replace values or tolerances specified in this test plan for the purpose of generating a UUT production test procedure."

SAE AS4112A-2017 history

  • 2017 SAE AS4112A-2017 Production Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Remote Terminals
  • 2011 SAE AS4112-2011 PRODUCTION TEST PLAN FOR THE DIGITAL TIME DIVISION COMMAND/RESPONSE MULTIPLEX DATA BUS REMOTE TERMINALS
  • 1989 SAE AS4112-1989 Production Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Remote Terminals
Production Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Remote Terminals



Copyright ©2024 All Rights Reserved