This document specifies the general requirements, test conditions and test methods for the integrated wiring test method for electrical testing of equipment within substation bays (hereinafter referred to as the "integrated wiring test method"). This document is applicable to the integrated wiring electrical test of equipment within the 35kV~1000kV substation interval, and other voltage level substations should be implemented as a reference.
DL/T 2639-2023 history
2023DL/T 2639-2023 Test method for integrated wiring of equipment within substation bays