SAE AIR1221-2013
Electromagnetic Compatibility (EMC) System Design Checklist

Standard No.
SAE AIR1221-2013
Release Date
2013
Published By
Society of Automotive Engineers (SAE)
Status
Replace By
SAE AIR1221A-2023
Latest
SAE AIR1221A-2023
Scope
This checklist is to be used by project personnel to assure that factors required for adequate system electromagnetic compatibility are considered and incorporated into a program. It provides a ready reference of EMC management and documentation requirements for a particular program from preproposal thru acquisition. When considered with individual equipments comprising the system and the electromagnetic operational environment in which the system will operate, the checklist will aid in the preparation of an EMC analysis. The analysis will facilitate the development of system-dependent EMC criteria and detailed system, subsystem, and equipment design requirements ensuring electromagnetic compatibility.

SAE AIR1221-2013 history

  • 2023 SAE AIR1221A-2023 Electromagnetic Compatibility (EMC) System Design Checklist
  • 2013 SAE AIR1221-2013 Electromagnetic Compatibility (EMC) System Design Checklist
  • 1971 SAE AIR1221-1971 Electromagnetic Compatibility (EMC) System Design Checklist
Electromagnetic Compatibility (EMC) System Design Checklist



Copyright ©2024 All Rights Reserved