This regulation is divided into 8 chapters and 1 appendix. The main contents include: general principles, terminology, symbols and abbreviations, basic provisions, process design, detection and control, construction and installation, commissioning and acceptance, operation management and safety, etc.
T/CECS 1347-2023 history
2023T/CECS 1347-2023 Technical regulations for advanced treatment of sewage ozone catalytic oxidation