This procedure is applicable to the preparation of preliminary design reports for bio-natural gas projects with a daily bio-natural gas production of 10,000 m3 or more for a single project.
NB/T 11322-2023 history
2023NB/T 11322-2023 Procedures for Preparation of Preliminary Design Report of Bionatural Gas Project