SL 290-2003
Specifications on land requisition and resettlement design for construction of water resources and hydropower project (English Version)

Standard No.
SL 290-2003
Language
Chinese, Available in English version
Release Date
2003
Published By
Professional Standard - Water Conservancy
Status
 2009-10
Replace By
SL 290-2009
Latest
SL 290-2009
Scope
This specification is applicable to the feasibility study report stage, preliminary design stage and technical installation design stage of large and medium-sized water conservancy and hydropower projects. The project proposal stage of large and medium-sized water conservancy and hydropower projects and small water conservancy and hydropower projects can be implemented with reference to this specification.

SL 290-2003 history

  • 2009 SL 290-2009 Specifications on land requisition and resettlement design for construction of water resources and hydropower project
  • 2003 SL 290-2003 Specifications on land requisition and resettlement design for construction of water resources and hydropower project
Specifications on land requisition and resettlement design for construction of water resources and hydropower project



Copyright ©2024 All Rights Reserved