TB/T 2075.23-2002
Fittings for overhead contact system of electrification railway-Part 23:Cross link (English Version)

Standard No.
TB/T 2075.23-2002
Language
Chinese, Available in English version
Release Date
2002
Published By
Professional Standard - Railway
Status
 2010-12
Replace By
TB/T 2075.12-2010
TB/T 2075.23-2010
Latest
TB/T 2075.12-2020
TB/T 2075.23-2020
Scope
This part specifies connector types, markings, materials, inspection rules, test methods, markings and packaging. This section applies to double-lug connectors used at the connection of two single-ring parts in electrified railway catenary systems and to D-type connectors used at the connection of single-ring and double-lug parts.

TB/T 2075.23-2002 history

  • 2020 TB/T 2075.12-2020 Electrified Railway Catenary Components Part 12: Pulley Compensation Device
  • 2010 TB/T 2075.12-2010 Fittings for overhead contact system in electrification railway.Part 12:Pully assembly for tensioning
  • 2002 TB/T 2075.23-2002 Fittings for overhead contact system of electrification railway-Part 23:Cross link

TB/T 2075.23-2002 Fittings for overhead contact system of electrification railway-Part 23:Cross link was changed to TB/T 2075.12-2010 Fittings for overhead contact system in electrification railway.Part 12:Pully assembly for tensioning.

Fittings for overhead contact system of electrification railway-Part 23:Cross link



Copyright ©2024 All Rights Reserved