This specification is applicable to the design, installation and use of 220/380V three-phase four-wire low-voltage power systems with the neutral point of the power supply directly grounded in temporary power projects at newly built, renovated and expanded industrial and civil buildings and municipal infrastructure construction sites. , repair and demolition. The 200/380V three-phase four-wire low-voltage power system with a directly grounded power supply neutral point dedicated to temporary power projects on construction sites must comply with the following regulations: 1. Use a three-level power distribution system; 2. Use a TN-S zero connection protection system. ; 3 Adopt a secondary leakage protection system.
JGJ 46-2005 history
2005JGJ 46-2005 Technical code for safety of temporary electrification on construction site