1.1 This technical requirement applies to the installation and acceptance of main boilers with water pipe type natural circulation and fuel oil for military and civilian ships equipped with main steam turbines. 1.2 This technical requirement does not include installation preparation, installation procedures and installation technology. 1.3 The main boiler can be installed by any of the following three methods: a. Installation on land; b. Install part of the cover on land, and install the rest in the furnace warehouse; c. Install directly in the furnace warehouse .
CB 1025-1983 history
2014CB 1025-2014 Installation technical requirements for main boiler of ship
1983CB 1025-1983 Technical requirements for marine main boiler installation