CECS 96-1997
Specification for soil nailing in foundation excavatons (English Version)

Standard No.
CECS 96-1997
Language
Chinese, Available in English version
Release Date
1997
Published By
Professional Standard - Recommended Standards for Engineering Construction
Latest
CECS 96-1997
Scope
This procedure is applicable to the design and construction of temporary soil nail support during vertical excavation of foundation pits or excavation on steep slopes. Bored grouting soil nails with steel bars as the central nail body are used. The depth of the foundation pit should not exceed 18m. Use The term should not exceed 18 months.