Scope
This procedure is applicable to the design and construction of temporary soil nail support during vertical excavation of foundation pits or excavation on steep slopes. Bored grouting soil nails with steel bars as the central nail body are used. The depth of the foundation pit should not exceed 18m. Use The term should not exceed 18 months.
CECS 96-1997 history
1997CECS 96-1997 Specification for soil nailing in foundation excavatons