HG/T 3778-2005
Technical regulations for chemical cleaning and prefilming of cooling water system (English Version)

Standard No.
HG/T 3778-2005
Language
Chinese, Available in English version
Release Date
2005
Published By
Professional Standard - Chemical Industry
Latest
HG/T 3778-2005
Scope
This rule applies to the cooling water system when the heat exchange efficiency of the water cooling equipment decreases due to scale, rust, biofouling and other water quality obstacles, affecting the production output and quality. When the production equipment is in normal operation, the cooling water system must be chemically inspected. Cleaning and pre-filming are especially suitable for cleaning cooling water systems that have been running for a long time and cannot be shut down for maintenance to remove obstacles such as scale, rust, and biological fouling. It can improve or basically restore the heat transfer efficiency of heat exchange equipment; it is also suitable for chemical cleaning of cooling water systems after new construction or major overhauls, and for chemical cleaning and pre-filming of large and medium-sized central air conditioners without stopping the system. Pre-film treatment is also suitable for film replenishment after the cooling water system is lower than the pH accident.

HG/T 3778-2005 Referenced Document

  • GB 50050 Code for design of industrial recirculating cooling water treatment*2007-10-25 Update
  • GB/T 15452 Industrial circulating cooling water.Determination of calcium and magnesium.EDTA titration method*2009-05-18 Update
  • GB/T 15893.1 Industrial circulating cooling water.Determination of turbidity.Diffused radiation method*2014-07-08 Update
  • GB/T 15893.2 Industrial circulating cooling water--Determination of pH--Electrometric method
  • HG/T 2387 Chemical cleaning quality code for industrial facility*2007-09-22 Update

HG/T 3778-2005 history

  • 2005 HG/T 3778-2005 Technical regulations for chemical cleaning and prefilming of cooling water system
Technical regulations for chemical cleaning and prefilming of cooling water system