T/CAPID 005.1-2023 The outline of quality supervision and inspection of multiple solid waste combustion for power generation projects—Part 1: Supervision and inspection before the garbage collection pool structure out of zero meters (English Version)
This document stipulates the supervision and inspection of the waste incineration power generation project before the garbage pool reaches zero meters, including the general principles and verification methods of supervision and inspection, the conditions for supervision and inspection, the supervision and inspection requirements for the quality behavior of the responsible subject, and the supervision and inspection requirements for the quality of the project entity. and quality supervision and testing.
T/CAPID 005.1-2023 history
2023T/CAPID 005.1-2023 The outline of quality supervision and inspection of multiple solid waste combustion for power generation projects—Part 1: Supervision and inspection before the garbage collection pool structure out of zero meters