This specification is a communications industry standard (YD/T) and belongs to the ICS 33.040.40 classification, applicable to new, renovated and expanded data centers. Its technological evolution is reflected in:
| Version | Core changes | Expansion of test dimensions |
|---|---|---|
| 2020 version | Integration of GB/T 1.1-2020 structural rules | Added L0-L6 seven-stage verification process |
| 2015 version | Establishment of basic framework | Focus on single device testing of electrical system |
N+X redundancy: The system adds X redundant components in addition to meeting basic requirements. Failure of any X component will not affect operation. Typical application case: When the UPS system adopts N+1 configuration, it can still run at full load even if a single unit fails.
Tencent data center implementation case: The installation offset problem of the chiller was discovered during the L2 pre-check phase to avoid subsequent system linkage failures.
| Equipment Type | Key Indicators | Allowance Deviation |
|---|---|---|
| UPS | Switching Time | ≤10ms |
| Transformer | Temperature Rise | ≤110℃ (110% load) |