Group Standards of the People's Republic of China CN / TUANTI
Latest
T/XECP 400-2024
Scope
According to the operating requirements of the "Injection Profile Logging Operation Procedures for Carbon Dioxide Injection Wells" and in line with the key points of the operation activities, technical work was carried out on confirmation of operating conditions, operation preparation, operation operations, logging data requirements, safety operation technical requirements and well control equipment equipment. Content writing. Refer to the relevant technical requirements of the current standard SY/T5600-2016 "Technical Specification for Petroleum Wireline Logging Operations Petroleum Workover Rig", so the relevant technical content will not be repeatedly described in the standard. For personnel protection, construction operations, quality requirements, safety technical specifications, etc., please refer to GBZ118-2020 Oil and Gas Field Logging Radiation Protection Requirements, SY5131-2008 Petroleum Radioactive Logging Radiation Protection Safety Regulations, SY/T5132-2012 Well Logging Raw Data Quality Requirements, SY /T5600-2016 Petroleum Wireline Logging Operation Technical Specifications, SY/T5726-2018 Petroleum Well Logging Operation Safety Specifications and other standard contents, reference the relevant requirements and complete the standard technical and safety requirements.
T/XECP 400-2024 history
2024T/XECP 400-2024 Code of practice for profile logging of carbon dioxide injected well