T/SIOT 051.2-2024 Technical Specifications for Secondary Water Supply Smart Pump Room Monitoring System Part 2: Perception and Transmission Requirements (English Version)
Group Standards of the People's Republic of China CN / TUANTI
Latest
T/SIOT 051.2-2024
Scope
This document specifies the system architecture, technical requirements and operational requirements for pump room sensing and transmission in the secondary water supply smart pump room monitoring system.
T/SIOT 051.2-2024 history
2024T/SIOT 051.2-2024 Technical Specifications for Secondary Water Supply Smart Pump Room Monitoring System Part 2: Perception and Transmission Requirements