The standard T/CEC 5087-2023 "Technical Specification for Installation Laser Tracking Measurement of Hydro Turbine Generating Units" was published on January 1, 2023. This specification aims to establish a technical framework and operational guidelines for the use of laser tracking measurement technology in the installation process of hydro turbine generating units. It provides detailed procedures and recommendations for ensuring precise alignment, positioning, and adjustment of components during the assembly phase.
With an increasing focus on precision and efficiency in power generation equipment manufacturing and installation, this standard serves to enhance the accuracy and reliability of water turbine generator installations through advanced measurement techniques. The use of laser tracking technology allows for real-time monitoring and correction, reducing errors and improving overall performance.
*** Please note: This description may not be accurate, please refer to the official documentation.
Copyright ©2026 All Rights Reserved
Update:
Tue, 10 Feb 2026 15:11:04 +0000