NB/T 11470-2023
Technical specifications for high-position directional long drilling on the roof of coal mining face for gas drainage (English Version)

Standard No.
NB/T 11470-2023
Language
Chinese, Available in English version
Release Date
2023
Published By
Professional Standard - Energy  CN  /  NB
Latest
NB/T 11470-2023
 

Introduction

Analysis of the core content of the standard

NB/T 11470-2023 standard systematically specifies the technical requirements for gas extraction from high-position directional long boreholes in coal seam roof for the first time. Its technical framework includes:

Technical elements Conventional drilling Directional long drilling
Drilling length ≤100m ≥200m
Trajectory control accuracy ±1.5m ±0.5m
Extraction efficiency 40-60% 75-90%

Key technological breakthroughs

1. Drilling structure design

A three-level segmented structure is adopted: casing hole section (Φ200mm×9m), penetrating hole section (Φ153mm), and target layer hole section (Φ153mm). The differentiated design balances construction safety and extraction efficiency.

2. Composite directional drilling technology

Innovatively adopt the "sliding directional drilling + composite drilling" dual mode, equipped with a mine measurement while drilling system (MWD), to achieve:

  • Deflection intensity ≤3°/m
  • Azimuth control accuracy ±2°
  • Trace adjustment response time <15min

Typical application case

Implementation data of a certain working face of Huaibei Mining:

  • Total length of borehole: 426m
  • Target layer: roof fracture zone 12-15m
  • Gas extraction concentration: 82%
  • Extraction pure amount: 6.8m³/min

Implementation Suggestions

  1. Preferably use dual-power composite reaming drill (torque ≥4500N·m)
  2. 1.75° large-angle screw motor should be used in complex formations
  3. The water-cement ratio of sealing cement slurry should be strictly controlled at 0.6-0.8
  4. A hole-mouth gas-water separation device
  5. must be equipped

NB/T 11470-2023 Referenced Document

  • GB 50471 Standard for design of the gas drainage engineering of coal mine

NB/T 11470-2023 history

  • 2023 NB/T 11470-2023 Technical specifications for high-position directional long drilling on the roof of coal mining face for gas drainage
Technical specifications for high-position directional long drilling on the roof of coal mining face for gas drainage

Topics on standards and specifications

Standard and Specification