NB/T 11470-2023 standard systematically specifies the technical requirements for gas extraction from high-position directional long boreholes in coal seam roof for the first time. Its technical framework includes:
| Technical elements | Conventional drilling | Directional long drilling |
|---|---|---|
| Drilling length | ≤100m | ≥200m |
| Trajectory control accuracy | ±1.5m | ±0.5m |
| Extraction efficiency | 40-60% | 75-90% |
A three-level segmented structure is adopted: casing hole section (Φ200mm×9m), penetrating hole section (Φ153mm), and target layer hole section (Φ153mm). The differentiated design balances construction safety and extraction efficiency.
Innovatively adopt the "sliding directional drilling + composite drilling" dual mode, equipped with a mine measurement while drilling system (MWD), to achieve:
Implementation data of a certain working face of Huaibei Mining: