This standard responds to the requirements of Document No. 58 of National Energy Comprehensive Technology (2019) and is compiled by the Electric Power Planning and Design Institute, marking the entry of digital design of power transmission and transformation projects in my country into the standardization stage. Compared with traditional two-dimensional design, the three-dimensional model coding system can improve design efficiency by more than 40% and reduce construction rework rate by 25%.
| Professional fields | Coding levels | Character composition | Application scenarios |
|---|---|---|---|
| Substation engineering | System-equipment-components | 2 letters + 4 digits | Digital transfer of substations |
| Overhead lines | Towers-fittings-foundations | 3 letters + 3 digits | Line corridor optimization |
| Cable lines | Channels-Accessories-Monitoring | 2 letters + 5 digits | Underground pipe network management |
Taking the 500kV main transformer as an example, its complete coding format is ETB1234:
E-Electrical major (1 digit) | TB-Transformer system (2 digits) | 1234-Equipment serial number (4 digits)
After a converter station project adopts this standard:
1. Model reuse rate increased to 78%
2. Design change cycle shortened by 15 working days
This standard lays the foundation for BIM-GIS integration and will extend to the direction of digital twins in the future. Attention should be paid to:
1. Compatibility with IoT device coding
2. Artificial intelligence-assisted coding verification technology