| Phase | Key Activities | Output Documents | Responsible Party |
|---|---|---|---|
| Planning Phase | Feasibility Assessment, Proposal Preparation, Economic Analysis | Experiment Proposal, Work Statement | Project Chief Engineer |
| Development Phase | Equipment Design, Ground Support System Preparation | Project Plan, Technical Specifications | Payload Engineer |
| Execution Phase | On-orbit Operation, Emergency Response | Progress report, summary report | Chief researcher |
According to the integration requirements of space experiment equipment, the following must be met:
Typical case: The microgravity fluid experiment device needs to pass the joint test of the vibration table and the thermal vacuum chamber.
Main updates compared to the 2003 version:
It is recommended to establish a three-line linkage management structure:
| Technical line | Hold a payload status review meeting every week |
| Progress line | Use Gantt chart to track key nodes |
| Quality line | Implement ISO 14300-2 Product Assurance Requirements |
Note: Special attention should be paid to the standardization of the fault diagnosis interface of on-orbit maintenance equipment.