| Dimensions | 2008 Edition (GA 793.3) | 202X New Edition | Impact of Changes |
|---|---|---|---|
| Acceptance Scope | Urban Monitoring and Alarm Networking System | Public Security Video Image Information System | Expanded to all police video application scenarios |
| Technical Indicators | Includes 6 types of subsystem acceptance | Focus on core function acceptance | Delete overly detailed technical terms |
| Acceptance Process | Three-level acceptance system | Three dimensions of construction/technology/data | Strengthen process traceability |
The new standard requires that the installation firmness inspection pass rate of front-end equipment be ≥80%, the lightning protection grounding resistance value be ≤4Ω, and the cable identification completeness rate be 100%. A case study of a local public security bureau shows that the use of intelligent inspection instruments can improve construction acceptance efficiency by 40%...
When the acceptance rate is between 0.6-0.8, it is recommended to: ①Prioritize rectification of Class A mandatory inspection items ②Supplement third-party inspection reports ③Extend the trial operation period by 15 days...
GA 1766-2021 Acceptance specification for public security video image information system has been changed from GA 793.3-2008 Conformity assessment of city area monitoring and alarming network system.Part 3:Acceptance specification of system.

Copyright ©2026 All Rights Reserved
Update:
Thu, 05 Feb 2026 04:53:10 +0000