ASTM F2249-24 specifies the on-site inspection requirements for temporary grounding jumper assemblies used to de-energize power lines, with the following highlights:
| Test method | Accuracy requirements | Determination formula | Applicable scenarios |
|---|---|---|---|
| DC resistance method | ±5% current control | Rm=1.05RL+0.32mΩ | Conventional testing |
| AC impedance method | ±5% current control | Zm=√(1.05RL+0.32)²+(XL)² | Inductive interference assessment |
| Temperature difference method | ±1℃ infrared temperature measurement | ΔT≤15°F(8.3°C) | High current working condition |
The standard establishes acceptance criteria through a two-factor judgment model:
Example: 2/0 AWG Class K cable at 20°C:
Major Changes in the 2016 Edition: Added the temperature compensation formula RT2 = R20 * [1 + 0.00393 * (T2 - 20)] to address resistance conversion issues at different ambient temperatures (Clause 7.5.1.1).
Safety Redundancy Design: Resistors are permitted to increase their manufacturing tolerance by 5% + aging margin, but must pass a current-carrying capability verification of 200A/3 minutes (Appendix X3).