Includes Errata April 16, 2018. This standard specifies acceptable primary containment leakage rate test requirements to assure valid testing. The scope includes: leakage test requirements; test instrumentation; test procedures; test methods; acceptance criteria; data analysis; inspection and recording of test results.
ANS 56.8-2002(R2016) history
2020ANS 56.8-2020 Containment System Leakage Testing Requirements
2002ANS 56.8-2002 Containment System Leakage Testing Requirements
1994ANS 56.8-1994 Containment System Leakage Testing Requirements
1987ANS 56.8-1987 Containment System Leakage Testing Requirements
1981ANS 56.8-1981 Containment System Leakage Testing Requirements