DB13(J) 58-2005
Regulations for acceptance of construction quality of municipal water supply and drainage structures and equipment installation projects (English Version)

Standard No.
DB13(J) 58-2005
Language
Chinese, Available in English version
Release Date
2006
Published By
Construction department of Hebei province
Scope
This specification is based on the notice issued by the Hebei Provincial Department of Construction on the issuance of the "First Batch Preparation Plan for Provincial Engineering Construction Standards and Standard Design in 2005" (Ji Jianzhi [2005] No. 154), jointly developed by the Tangshan Construction Engineering Quality Supervision and Inspection Station and relevant units. Compiled. During the preparation process of this procedure, the preparation team conducted extensive investigations and research, summarized the practical experience of construction quality acceptance of municipal infrastructure projects in Hebei Province, and adhered to the principles of "separation of inspection and evaluation, strengthening acceptance, improving means, and process control" The guiding ideology was reviewed and finalized by the Hebei Provincial Department of Construction. This regulation mainly includes general principles, terminology, basic regulations, construction measurements, foundations and foundations, masonry, steel bars, formwork, concrete, special structural engineering, detailed construction, ancillary engineering, functional testing, mechanical equipment installation, process pipeline installation and other engineering projects. The content of construction quality acceptance. There are also 4 appendices, which mainly include inspection methods, inspection forms, etc. that are often used during quality inspection and acceptance at construction sites. This procedure must be used in conjunction with the "Uniform Standards for Construction Quality Acceptance of Municipal Infrastructure Projects" (DB13(J)53-2005) and "General Procedures for Construction Quality Acceptance of Municipal Infrastructure Projects" (DB13(J)54-2005). This procedure applies to the construction quality acceptance of newly built, renovated, and expanded water supply and drainage structures and equipment installation projects within the jurisdiction of Hebei Province.



Copyright ©2024 All Rights Reserved