NB/T 11193-2023
Turbine cylindrical valve installation and commissioning procedures (English Version)

Standard No.
NB/T 11193-2023
Language
Chinese, Available in English version
Release Date
2023
Published By
Professional Standard - Energy
Latest
NB/T 11193-2023
 

Introduction

Analysis of the core content of the standard

Technical elements Installation requirements Debugging indicators
Simplified assembly Roundness ≤3mm, cylindricity ≤4mm
Split surface misalignment ≤0.05mm
Welding deformation ≤0.30mm
Servomotor Verticality ≤0.20mm/m
Preload deviation ±10%
Pressure test 1.25 times design pressure
Guide system Vertical degree ≤ 0.10mm
Gap meets manufacturer requirements
Full stroke synchronization deviation ≤ 5mm

Key technology implementation points

Hydraulic control system selection comparison

Chain-type mechanical control: Forced synchronization through physical chain, regular lubrication and maintenance required
Coaxial oil motor type: Using the volume balance principle, the pipeline layout requires symmetry
Fully digital integrated type: Pulse control has high accuracy and encoder zero point calibration is required

Debugging risk prevention and control

  • The guide vane opening needs to be kept fixed during the dynamic water closing test
  • The oil pressure should be increased in stages during the system oil filling stage
  • The sealing surface detection requires a kerosene leakage test

Background of Standard Evolution

Based on the 2018 Energy Bureau Standard Revision Plan (National Energy Comprehensive Technology [2018] No. 191), it integrates the engineering practice experience of units such as Three Gorges and Dongfang Electric, and systematically standardizes the debugging process of different control methods for the first time.

NB/T 11193-2023 Referenced Document

  • GB 50171 Code for construction and acceptance of switchboard outfit complete cubicle and secondary circuit electric equipment installation engineering
  • GB/T 8564 Technical Specifications for Installation of Hydrogenerator Sets*2023-11-27 Update

NB/T 11193-2023 history

  • 2023 NB/T 11193-2023 Turbine cylindrical valve installation and commissioning procedures
Turbine cylindrical valve installation and commissioning procedures

Topics on standards and specifications

Standard and Specification




Copyright ©2025 All Rights Reserved