API RP 551-1993
Process Measurement Instrumentation (First Edition)

Standard No.
API RP 551-1993
Release Date
1993
Published By
API - American Petroleum Institute
Status
 2016-02
Replace By
API RP 551:2016
API RP 551-2016
Latest
API RP 551:2016
API RP 551-2016
Replace
API RP 550 P1S2:1974 API RP 550 P1S8:1974
Scope
"The material in Sections 2-6 was previously presented in several sections of Part 1 of API Recommended Practice 550@ which is now out of print: a. Section 2 - API Recommended Practice 550@ Part I@ Section 1@ ""Flow."" b. Section 3 - API Recommended Practice 550@ Part I@ Section 2@ ""Level."" c. Section 4 - API Recommended Practice 550@ Part I@ Section 4@ ""Pressure."" d. Section 5 - API Recommended Practice 550@ Part I@ Section 3@ ""Temperature."" e. Section 6 - API Recommended Practice 550@ Part I@ Section 8@ ""Seals@ Purges@ and Winterizing."" The procedures for installation of the instruments covered in this recommended practice are based on experience with and evaluation of many installations. They represent the installation practices that yield the most consistently accurate results and have proved to be practical and safe. Process and environmental protection is covered in a general fashion in Section 6. Where required@ specific instances of process and environmental protection are covered in Sections 2 - 5. Tank gauging is outside the scope of Section 3. The applicable publication is referenced in that section. Where appropriate@ installation drawings@ cautionary notes@ and explanations are included. Valves and piping that are typically covered in piping standards have been omitted from most installation drawings."

API RP 551-1993 history




Copyright ©2024 All Rights Reserved