Key points of operation and maintenance
- Establish a two-person inspection system and check system logs daily
- The number of spare sensors ≥ 20% of the equipment in use
- Calibrate methane sensors every 10 days
This standard specifies the full-chain technical requirements for the intelligent transformation of coal mine gas extraction systems, including 12 types of functional modules from the ground control center to underground sensors, and achieves an increase of more than 40% in gas extraction efficiency through core equipment such as intelligent extraction pumping stations and three-dimensional drilling design systems.
| Functional Module | Traditional System | Intelligent System | Technological Breakthrough |
|---|---|---|---|
| Extraction Pumping Station | Manual Inspection | Unattended + AI Control | Response Time≤15s |
| Pipeline Network Control | Manual Valve Adjustment | Multi-point Sensing + Automatic Balancing | Negative Pressure Fluctuation≤5% |
| Data Management | Paper Ledger | Digital Twin + Predictive Analysis | Automated compliance assessment |
The system requires the deployment of 7 types of mining sensors, including:
All sensors must meet the IP65 protection level and have stability for more than 15 days.
After deploying the intelligent system in a coal mine in Shanxi:
| Phase | Key tasks | Period |
| 1. Infrastructure construction | Laying of optical fiber network and installation of intelligent sensors | 3-6 months |
| 2. System integration | Deploy ground control center and intelligent pump station | 6-9 months |
| 3. Optimize operation | Big data model training, system parameter adjustment | Continuous |
It is recommended to prioritize the transformation of high-gas working faces and goaf closed systems, and the annual transformation investment should not be less than 15% of the total value of the extraction system.

Copyright ©2025 All Rights Reserved